>>> Bill of materials <<<
>>> Schema <<<
>>> Firmware Sources <<<
ATMega88a FuseBits: Low= 0xEE / High= 0xD4 / Extended= 0xFC
>>> Short manual <<<

RS-232 connection parameters: 9600,8,N,1

There is an error at PCB - Zener diode marked DZ4 should be mount in the way shown at schematic.

    Orders&Payments:
  • Evan U. - 2 sets - 40.00E - ShortlegCats
  • Greg T. - 1 set - 20.00E - Nuadormrac
  • Fabio M. T. - 1 set - 20.00E - Fabio
  • Philipp B. - 2 sets - 40.00E - Philipp
  • Suzanne C. - 1 set - 20.00E - CeDriCXD
  • Ramion S. - 2 set - 40.00E - fansyl
  • Olivier M. - 1 set - 20.00E - Elgrande71
  • Thomas F. - 1 set - 20.00E - GrafZahl
  • David B. - 1 set - 21.20E - Low_Gap
  • Jannik R. - 1 set - 20.00E - chillomatic
  • Michael D. - 1 set - 20.00E - midopple
  • Tamara A. S. - 1 set - 20.00E - Tamara
  • Jean M. S. - 1 set - 20.00E - SetiOne
  • Steve I. - 1 set - 20.00E - Steve
  • Frederic A. - 1 set - 20.00E - Fredjke
  • Eric K. - 4 set - 80.00E - Eric
  • Gregoire B. - 1 set - 20.00E - Greg
  • Ralf M. - 1 set - 20.00E - Rutor
  • Holger H. - 2 sets - 40.00E - Holger
  • Marco B. - 1 set - 20.00E - Busla
  • Paulo S. - 3 sets - 62.50E - Cyph3r
  • Joseph C. - 1 set - 20.00E - Josiah
  • Steve H. - 5 sets - 117.80E - SteveUSA
  • Ivo K. - 1 set - 20.00E - miki-e
  • David M. - 1 set - 22.00E - mitchell
  • Robert K. - 26 sets - 520.00E - Crashtest
  • Tomas B. - 9 sets - 180.00E - Provocator
  • Eric G. - 1 set - 20.00E - radioguinne
  • Dennis S. - 1 set - 20.00E - Auriel
  • Roland S. - 2 sets - 42.50E - firstomega
  • Hans-Werner G. - 1 set - 20.00E - KARIKOLA
  • Jens K. - 1 set - 20.00E - Kniffo
  • Herald P. - 1 set - 20.00E - pons66
  • Sajjad I. - 1 set - 20.00E - ID:7203
  • Przemysław N. - 1 set - 20.00E - PrzemekPL
  • Henry Y. - 1 set - 21.17E - cncguy2000
  • Alex P. - 2 sets - 40.00E - alex101fc
  • James W. - 1 set - 20.00E - Medijate --> unclaimed, returned to sender
  • Maximilian R. - 1 set - 20.00E - Smarthuman
  • Mariusz G. - 1 set - 20.00E - kriu
  • Krzysztof O. - 1 set - 20.00E - krzysztofo
  • Frank L. - 1 set - 20.00E - 6od6in6
  • David M. - 1 set - 20.00E - ID:7235
  • Eric L. - 1 set - 20.00E - Erik
  • Sander K. - 2 sets - 40.00E - sir sant
  • Robert H. - 3 sets - 60.00E - Roadranner
  • Krzysztof K. - 1 set - 20.00E - Daimon
  • Sławomir Rz. - 1 set - 20.00E - TJM


(99/100)* 100% SOLD!

* - 1 set for me :P

16.01.14 - Geiger tubes arrived,
17.01.14 - Transformers ordered and paid,
07.02.14 - ATMega's88 & tube(+) connectors arrived,
22.02.14 - Drawing of the enclosure was send for pricing / Transformers were send / PCB Design - 90% done,
26.02.14 - Transformers arrived,
28.02.14 - Trial enclosure was send for machining, should be done to 6th of March, PCB design 95% done,
04.03.14 - PCB design finished, PCB send to manufacturer - expected time of delivery 17-19.03.14
06.03.14 - Sample (no.1) enclosure arrived - checking... Some changes done and another one sample should be here at Mon/Tue
11.03.14 - Payment received by PCB manufacturer (boards in production) & I'm still waiting for second sample of the enclosure
13.03.14 - Second sample arrived. Problem appeared. I asked for verification and a third sample :/
19.03.14 - I've got PCB, I've got third enclosure sample & I've got another $#!$@! problem with it...
20.03.14 - I sent a PCB with mounted essential parts to the enclosure manufacturer for corrections.
25.03.14 - Enclosures manufacturing accepted and paid.
28.03.14 - Enclosures arrived :) / I'm fighting with firmware.
04.04.14 - All transformer cores are glued, all tubes are tested. Now I'm going to program microcontrollers and at Monday I'll start shipping.

08.04.14 - All USA/Canada and 35 to Germany were sent.
09.04.14 - Portugal, France, Belgium, Italy, Estonia + 1 to Poland - done.
10.04.14 - Austria, Switzerland and Germany - done.
18.04.14 - Czech, Poland, +1 to Germany
30.04.14 - France
15.05.14 - UK

Message boards : Cafe : First batch of KIT - Orders&Payments [closed]


Main page · Your account · Message boards


Copyright © 2024 BOINC@Poland | Open Science for the future